LSCRE secured Tiburon at a 23.5% discount to recent sales comps through its track record and relationships in Houston. The seller is a California-based investor focused on office properties, and Tiburon was the only Houston multifamily asset in his portfolio. Third-party management left operating upside that LSCRE is positioned to capture, with over 2,300 units within 10 miles and three communities on the same road.
Location:
- Less than 2 mi from Apple’s new Houston manufacturing center, operated with Foxconn
- The plant already ships AI servers, and Mac mini production starts later this year
- Foxconn has committed another $71.9M to expand the site
- Power Electronics plans a 53-acre manufacturing campus ~2 mi away and expects to create 400+ jobs
- Access to I-290 and Beltway 8 puts 300,000+ jobs within 20 minutes of the property
- Schools: zoned to Cy-Fair ISD, the #2 school district in Harris County and #1 for athletics
- Limited new supply: 28 units under construction within 5 mi (0.1% of inventory)
- Houston added just under 127,000 residents in the 12 months ending July 1, 2025, the most of any U.S. city (U.S. Census)
- North Houston posted the strongest annual rent growth in the metro, at 5.4%
- Household income of $88,791 within 1 mi. Renting at Tiburon costs $1,350 per month, vs. $2,640 to own a median-priced $306,000 home (assumes 20% down and a 6.5% mortgage)
Property:
- Purchase Price: $38,000,000 ($118,750/unit) / Going-In Cap Rate: 5.02% / Y1 Cap Rate: 5.62%
- Five comparable sales from the 9 months before acquisition averaged $155,138/unit. LSCRE’s basis is $36K/unit lower
- Total Capitalization: $44,400,000 ($138,750/unit), including $4,295,000 ($13,422/unit) of CapEx and reserves
- 92.5% occupancy at underwriting / 70.1% breakeven occupancy
- In-place rent of $1,330 ($1.45/SF) vs. a $1,539 ($1.52/SF) average across four nearby rent comps
- Average unit size: 910 SF
- All units are in classic condition: Formica counters, cherry cabinets, faux-wood plank flooring, and full-size washer/dryer sets
- Amenities: resort-style pool, resident clubhouse, fitness center, outdoor grills, courtyard, and attached and detached garages
Business Plan Highlights:
- 55%+ projected NOI increase from expense savings and value-add initiatives
- Same road as three LSCRE communities: Preserve at Copperleaf, Preserve at Copper Springs and Discovery at West Road
◦ 896 units with 94% average occupancy
◦ All three run under their underwritten operating expenses: Copperleaf by $652,581 over the trailing 12 months, Copper Springs by 18.7% in its first full quarter, and Discovery by 7.1% over eight months of ownership
◦ Copperleaf has averaged 97.9% occupancy over the trailing 12 months
- Controllable expenses cut by 21%+
◦ Vertically integrated operations: in-house make-ready and construction work, in-house valet trash, and leaner administrative costs
◦ Shared maintenance and make-ready crews and staff across 1,322 LSCRE units within 5 mi
- Platinum renovation of 80 units ($13,500/unit) to achieve ~$175 effective rent premiums
◦ Quartz countertops, stainless steel appliances, undermount sinks, gooseneck faucets, vinyl plank flooring, and repainted cabinet fronts
◦ Countertops and appliances will be sourced through Home Depot’s contractor program, saving an estimated $2,500 per unit. These savings are not included in the projections
- Full exterior repaint ($375,000), pool upgrades ($60,000), and a parcel locker ($45,000)
- Bulk Wi-Fi and package locker programs to generate $30+/month in additional income per unit
Capital Stack:
- Debt:
◦ $23,400,000 / 61.6% LTV / 56.7% LTC / 5.82% rate
◦ Matures May 1, 2030 / Interest-only through May 2027, then 30-year amortization / Standard Defeasance
- Equity: $21,000,000
Return Metrics (Projected):
- Class A ($100K min): Net AAR: 23.7% / EM: 1.71x / Avg CoC: 5.3%
- Class B ($500K min): Net AAR: 27.1% / EM: 1.81x / Avg CoC: 5.3%
- Class C ($1M min): Net AAR: 29.6% / EM: 1.89x / Avg CoC: 5.3%
- 3-year projected hold / Stabilized Yield on Cost (Untrended): 7.28%
- Monthly distributions begin November 2026